30 0226_30 0323_1222019_095246.mp4
30 0226_30 0323_1222019_102306.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:22 AM
0.1 ft. - Water Level, 5 %of cross sectional area
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
12.5 ft. - General Photograph
12.5 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start - 5% ROOTS
26.5 ft. - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR
82.3 ft. - General Photograph
104.2 ft. - General Photograph
122.1 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
126 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start
127.1 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
129.4 ft. - General Photograph
132 ft. - Deformed Horizontal, 15 % - DEFORMED 11 TO 4 0'CLOCK
141.8 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | CM | — |
| 12.5 | MGP | — |
| 222.7 | MGP | — |
| 122.1 | FS | — |
| 127.1 | FM | — |
| 221.1 | RFJ | — |
| 129.4 | MGP | — |
| 0.1 | MWL | — |
| 141.8 | MGP | — |
| 161.5 | B | — |
| 82.3 | MGP | — |
| 126 | MWLS | — |
| 2 | SSS | — |
| 104.2 | MGP | — |
| 161.5 | FM | — |
| 223.3 | AMH | 11:23 AM |
| 161.5 | FS | — |
| 12.5 | RFJ | 5% ROOTS |
| 0 | AMH | 9:22 AM |
| 221.1 | SSS | — |
| 221.1 | CM | — |
| 132 | DH | DEFORMED 11 TO 4 0'CLOCK |
| 0.2 | MWM | — |
| 200 | MWLS | — |
| 134.4 | B | — |
| 223 | MGO | Grease Throughout The Reach (5%) |
| 26.5 | RFJ | — |