Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 6, 2019, 12:53 PM
  • Section#4_02 1656_02 1655__1262019__10283.mp4

Date
12/06/2019
W/O
0798195
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00289
PipeID
P18811
Time
4:53 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
10283
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
LAS ANGLES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20191206MDM_MONTERY_PARK_EXTENSION_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1656
Downstream MH
02 1655
Dir. of Survey
Downstream
Length Surveyed
239.7 ft.
Total Length
239.7 ft.
Structural Index
3
Structural Quick
4I2I
Structural Rating
288
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
288
Pipe schematic from manhole 02 1656 to 02 1655
MH: 02 1656MH: 02 1655downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:00AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG7.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED19.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN26.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED36.6 ft. MGP - General Photograph - 15" NRCP43.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN54.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED68.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN102.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN127 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN158.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN239.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED239.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG239.7 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (5)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    0 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    7.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG  ATTACHED

    26.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • General Photograph - 15" NRCP

    36.6 ft. - General Photograph - 15" NRCP

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    54.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (17)

DistanceCodeObservation
26.1SSSPEELING CONCRETE SEVERE AGG ATTACHED
127TFOPEN
158.2TFOPEN
239.7AMH5:25AM
43.6TFOPEN
0MWL
68.8TFOPEN
54.7SSSPEELING CONCRETE SEVERE AGG ATTACHED
0AMH5:00AM
19.6TFOPEN
0MWM
102.4TFOPEN
7.4SSSPEELING CONCRETE SEVERE AGG ATTACHED
239.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
36.6MGP15" NRCP
0SAMSEVERE AGG
239.5SAMSEVERE AGG

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2019-12-06T04:53:21-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false