Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2019, 05:46 AM
  • 16 0377_16 0376 _10312019_215950.mp4

Date
10/31/2019
W/O
793293
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00665
PipeID
P13428
Time
10:46 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7105
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
14
Purpose
Routine Assessment
Project
WO_793293_TV16031_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
14 in.
Width
14 in.
Upstream MH
16 0377
Downstream MH
16 0376
Dir. of Survey
Downstream
Length Surveyed
258.2 ft.
Total Length
258.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
102
Pipe schematic from manhole 16 0377 to 16 0376
MH: 16 0377MH: 16 0376downstream0 ft. MGO - General Observation - DAMAGED TROUGH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03772 ft. MLC - Lining Change, Cured in place2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start98.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"257 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish258.2 ft. AMH - Downstream Manhole, Survey Ends - 16 0376258.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • General Observation - DAMAGED TROUGH

    0 ft. - General Observation - DAMAGED TROUGH

  • Lining Change, Cured in place

    2 ft. - Lining Change, Cured in place

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
98.2TFC
169.9TFA
0MGODAMAGED TROUGH
2MLC
0MWL
257DAGS
0MWM
258.2AMH16 0376
258.2MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH16 0377
2DAGS

Properties (7)

additional_info
SC378736
custom_field_two
4
customer
LACSD
datetime
2019-10-31T22:46:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP