Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 15, 2019, 08:07 PM
  • 16 0365_16 0364 _11152019_121905.mp4

Date
11/15/2019
W/O
793293
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00665
PipeID
P13416
Time
12:07 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6824
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_793293_TV16031_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0365
Downstream MH
16 0364
Dir. of Survey
Downstream
Length Surveyed
201.8 ft.
Total Length
201.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
5
Pipe schematic from manhole 16 0365 to 16 0364
MH: 16 0365MH: 16 0364downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 03650.1 ft. MWM - Water Mark, 40 %of cross sectional area0.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK0.1 ft. MWL - Water Level, 30 %of cross sectional area0.1 ft. MLC - Lining Change, Cured in place192 ft. OBZ - Obstacles Other, 10 %of cross sectional area, at 06 o'clock, Start - DEBRIS199 ft. OBZ - Obstacles Other, 10 %of cross sectional area, at 06 o'clock, Finish - DEBRIS200 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - @ MH201.8 ft. AMH - Downstream Manhole, Survey Ends - 16 0364201.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (1)

  • Obstacles Other, 10 %of cross sectional area, at 06 o'clock, Start - DEBRIS

    192 ft. - Obstacles Other, 10 %of cross sectional area, at 06 o'clock, Start - DEBRIS

Observations (10)

DistanceCodeObservation
0.1MWM
0.1MGOCONN @ MH 9 O'CLOCK
0.1MWL
201.8AMH16 0364
199OBZDEBRIS
200VC@ MH
0.1MLC
201.8MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH16 0365
192OBZDEBRIS

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2019-11-15T12:07:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP