Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 28, 2019, 08:43 AM
  • 16 0350_16 0349 _10282019_005431.mp4

Date
10/28/2019
W/O
793293
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00665
PipeID
P13401
Time
1:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7101
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_793293_TV16031_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
16 0350
Downstream MH
16 0349
Dir. of Survey
Downstream
Length Surveyed
145.8 ft.
Total Length
145.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
56
Pipe schematic from manhole 16 0350 to 16 0349
MH: 16 0350MH: 16 0349downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03500 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MLC - Lining Change, Cured in place2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start143.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish145.8 ft. AMH - Downstream Manhole, Survey Ends - 16 0349

Observation photos (2)

  • Lining Change, Cured in place

    2 ft. - Lining Change, Cured in place

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWL
0AMH16 0350
2MLC
0MWM
143.7DAGS
2DAGS
145.8AMH16 0349

Properties (7)

additional_info
SC378724
custom_field_two
4
customer
LACSD
datetime
2019-10-28T01:43:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP