Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 13, 2019, 08:29 AM
  • 16 0309_16 0308 _11132019_004300.mp4

Date
11/13/2019
W/O
793293
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00665
PipeID
P13360
Time
12:29 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6334
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
21
Purpose
Routine Assessment
Project
WO_793293_TV16031_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
20 in.
Width
20 in.
Upstream MH
16 0309
Downstream MH
16 0308
Dir. of Survey
Downstream
Length Surveyed
278.4 ft.
Total Length
278.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2K11
O&M Rating
117
Overall Index
2
Overall Quick
Overall Rating
117
Pipe schematic from manhole 16 0309 to 16 0308
MH: 16 0309MH: 16 0308downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03090 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - HEAVY STEAM12.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN53.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN71.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN120 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN122.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN133 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN161 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.5 ft. RFC - Roots Fine Connection, at 02 o'clock219.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 80% GREASE-LATERAL222.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"249.9 ft. RTL - Roots Tap Lateral, at 10 o'clock, 5 %, within 8 inches of joint: YES249.9 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - ACTIVE260 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN262.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN276 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish278.4 ft. AMH - Downstream Manhole, Survey Ends - 16 0308

Observations (21)

DistanceCodeObservation
12.9TFOPEN
260TFOPEN
53.6TFOPEN
222.1TFA
276DAGS
278.4AMH16 0308
120TFOPEN
2DAGS
0MWM
2.1MGOHEAVY STEAM
133TFOPEN
219.5RFC
122.8TFOPEN
249.9RTL
219.5TFD80% GREASE-LATERAL
0AMH16 0309
262.7TFOPEN
161TFA
0MWL
71.6TFOPEN
249.9TFDACTIVE

Properties (7)

additional_info
SC365777
custom_field_two
4
customer
LACSD
datetime
2019-11-13T00:29:01-08:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP