Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 5, 2019, 11:42 AM
  • F 0065_F 0064 _11052019_035432.mp4

Date
11/05/2019
W/O
792836
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00035
PipeID
P10150
Time
3:42 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7085
Sewer Name
F JOINT OUTFALL F - UNIT 3A
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_792836_TV02235_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
F 0065
Downstream MH
F 0064
Dir. of Survey
Downstream
Length Surveyed
65.6 ft.
Total Length
65.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole F 0065 to F 0064
MH: F 0065MH: F 0064downstream0 ft. MGO - General Observation - STEAM IN SEWER0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00650 ft. MWL - Water Level, 45 %of cross sectional area10 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10 ft. MGO - General Observation - MAG COAT THROUGHOUT10 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start63.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish63.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish65.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK65.6 ft. AMH - Downstream Manhole, Survey Ends - F 0064

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
65.6MGOCONNECTION AT MH 3 O'CLOCK
10SSS
63.3SSS
0MGOSTEAM IN SEWER
0MWM
0AMHF 0065
10MGOMAG COAT THROUGHOUT
63.3SAP
10SAP
65.6AMHF 0064
0MWL

Properties (6)

additional_info
SC378685
custom_field_two
3
customer
LACSD
datetime
2019-11-05T03:42:39-08:00
documentation
PROPIPE
is_lateral_inspection
false