Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2019, 10:17 AM
  • H 0292_H 0291 _11182019_025837.mp4

Date
11/18/2019
W/O
792818
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00174
PipeID
P10747
Time
2:17 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7163
Sewer Name
H JOINT OUTFALL H - UNIT 3
City
PICO RIVIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_792818_TV02323_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0291
Downstream MH
H 0292
Dir. of Survey
Upstream
Length Surveyed
488 ft.
Total Length
488 ft.
Structural Index
2
Structural Quick
513Q
Structural Rating
463
O&M Index
2
O&M Quick
412R
O&M Rating
194
Overall Index
2
Overall Quick
Overall Rating
657
Pipe schematic from manhole H 0291 to H 0292
MH: H 0291MH: H 0292upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 02922.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish9.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"16 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES18 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"437 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"449.4 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"449.4 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish449.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start461.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start478 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE482.5 ft. MGO - General Observation - MAG COAT THROUGHOUT482.5 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start488 ft. MWM - Water Mark, 50 %of cross sectional area488 ft. AMH - Downstream Manhole, Survey Begins - H 0291488 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (4)

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Compacted,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    10 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    26.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    38.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
472SRV
26.3SSS
488AMHH 0292
0MWM
38.6TB
0AMHH 0291
485.5SAP
38.6SRI
51TBA
485.5SSS
470TB
0MWL
5.5MGOMAG COAT THROUGHOUT
485.5DSC
10DSCSLUDGE
5.5SRI
38.6SAP
478.7TB

Properties (6)

additional_info
SC398403
custom_field_two
3
customer
LACSD
datetime
2019-11-18T02:17:04-08:00
documentation
PROPIPE
is_lateral_inspection
false