Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2019, 10:21 AM
  • 01 0568_01 0567A_02222019_023015.mp4

Date
02/22/2019
W/O
750737
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00194
PipeID
P25577
Time
2:21 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6281
Sewer Name
01 ALAMEDA STREET EXTENSION TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_750737_TV01001_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
01 0568
Downstream MH
01 0567A
Dir. of Survey
Downstream
Length Surveyed
154.1 ft.
Total Length
154.1 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
150
Pipe schematic from manhole 01 0568 to 01 0567A
MH: 01 0568MH: 01 0567Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 05680 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT THROUGHOUT153 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish153 ft. MGO - General Observation - PEELING AND FLAKIING THROUGHOUT153 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish154.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0567A154.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observations (11)

DistanceCodeObservation
153SSS
0MWL
153MGOPEELING AND FLAKIING THROUGHOUT
154.1AMH01 0567A
0AMH01 0568
154.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SAV
153SAV
2SSS
2MGO70% MAG COAT THROUGHOUT
0MWM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-02-22T02:21:04-08:00
documentation
PROPIPE
is_lateral_inspection
false