Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 29, 2019, 08:47 AM
  • 16 0339_16 0338 _10292019_010040.mp4

Date
10/29/2019
W/O
792820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00665
PipeID
P13390
Time
1:47 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7096
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_792820_TV16061_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0338
Downstream MH
16 0339
Dir. of Survey
Upstream
Length Surveyed
300.6 ft.
Total Length
300.6 ft.
Structural Index
4
Structural Quick
4K3K
Structural Rating
413
O&M Index
2
O&M Quick
2W00
O&M Rating
238
Overall Index
3
Overall Quick
Overall Rating
651
Pipe schematic from manhole 16 0338 to 16 0339
MH: 16 0338MH: 16 0339upstream0 ft. AMH - Upstream Manhole, Survey Ends - 16 03391.9 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE MINERAL OR PIPE DISCOLORATION1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish14.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"135.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"152.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"155.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"228 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.1 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, #v, within 8 inches of joint: YES, 4", 1"291.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"296.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE MINERAL OR PIPE DISCOLORATION298.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start300.6 ft. MWL - Water Level, 15 %of cross sectional area300.6 ft. AMH - Downstream Manhole, Survey Begins - 16 0338300.6 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - POSSIBLE MINERAL OR PIPE DISCOLORATION

    2.1 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE MINERAL OR PIPE DISCOLORATION

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, #v, within 8 inches of joint: YES, 4", 1"

    30.5 ft. - Tap Break-In Intruding, at 10 o'clock, -, #v, within 8 inches of joint: YES, 4", 1"

Observations (18)

DistanceCodeObservation
145TFC
2DAGS
286.3TFC
300.6AMH16 0339
72.6TFC
298.7DAZPOSSIBLE MINERAL OR PIPE DISCOLORATION
298.7DAGS
2.1DAZPOSSIBLE MINERAL OR PIPE DISCOLORATION
3.9FM
148.2TBA
164.9TBA
0MWL
298.7FM
217TFC
30.5TBI
8.7TFC
0AMH16 0338
0MWM

Properties (6)

additional_info
SC378729
custom_field_two
3
customer
LACSD
datetime
2019-10-29T01:47:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false