Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 29, 2019, 09:33 AM
  • 16 0336_16 0335 _10292019_014628.mp4

Date
10/29/2019
W/O
792820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00665
PipeID
P13387
Time
2:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7096
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_792820_TV16061_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0336
Downstream MH
16 0335
Dir. of Survey
Downstream
Length Surveyed
203.7 ft.
Total Length
203.7 ft.
Structural Index
4
Structural Quick
4F3F
Structural Rating
259
O&M Index
2
O&M Quick
2G00
O&M Rating
80
Overall Index
3
Overall Quick
Overall Rating
339
Pipe schematic from manhole 16 0336 to 16 0335
MH: 16 0336MH: 16 0335downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 03360 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"37.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"109 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"183.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish201.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish203.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0335203.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2DAGS
201.9DAGS
109TFC
34.2TFA
106.1TFA
180.3TFC
16.8FM
203.7AMH16 0335
0AMH16 0336
201.9FM
0MWM
37.1TFC
183.3TFC
203.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWL

Properties (6)

additional_info
SC378729
custom_field_two
2
customer
LACSD
datetime
2019-10-29T02:33:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false