Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2019, 10:37 AM
  • 05 2360_05 0861 _06182019_040000.mp4

Date
06/18/2019
W/O
766396
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00457
PipeID
P23417
Time
3:37 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6594
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Routine Assessment
Project
WO_766396_TV05196_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0861
Downstream MH
05 2360
Dir. of Survey
Upstream
Length Surveyed
155 ft.
Total Length
155 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
2
O&M Quick
2K11
O&M Rating
125
Overall Index
2
Overall Quick
Overall Rating
132
Pipe schematic from manhole 05 0861 to 05 2360
MH: 05 0861MH: 05 2360upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 23600.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish0.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish33.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE.36.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"68.1 ft. CM - Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES84 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE.86.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE.91.3 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES119.7 ft. CS - Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES153 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start153 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start155 ft. VC - Vermin Cockroach, within 8 inches of joint: NO155 ft. AMH - Downstream Manhole, Survey Begins - 05 0861155 ft. MWM - Water Mark, 35 %of cross sectional area155 ft. MWL - Water Level, 15 %of cross sectional area155 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK & 9 OCLOCK.

Observation photos (5)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

    35.3 ft. - Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

    63.7 ft. - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

    86.9 ft. - Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
35.3CS
68.3TFCDEBRIS INSIDE.
0VC
71TFCDEBRIS INSIDE.
0AMH05 0861
0MWM
154.6DAE
118.9TFC
86.9CM
2DAE
155AMH05 2360
63.7CS
2DAGS
0MWL
154.6DAGS
121.5TFCDEBRIS INSIDE.
0MGOCONNECTION IN MH 3 OCLOCK & 9 OCLOCK.

Properties (4)

customer
LACSD
datetime
2019-06-18T03:37:48-07:00
documentation
ProPipe
is_lateral_inspection
false