- Date
- 06/17/2019
- W/O
- 766396
- Weather
- Dry
- Operator/Surveyor
- J. VARGAS
- Sewer ID
- Z00457
- PipeID
- P06087
- Time
- 5:03 AM
- Certificate
- U-209-8149
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K5598
- Sewer Name
- 05 IMPERIAL HIGHWAY EXTENSION TRUNK
- City
- INGLEWOOD
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 09
- Purpose
- Routine Assessment
- Project
- WO_766396_TV05196_MAY2019
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 10 in.
- Width
- 10 in.
- Upstream MH
- 05 0857
- Downstream MH
- 05 2458
- Dir. of Survey
- Downstream
- Length Surveyed
- 327.1 ft.
- Total Length
- 327.1 ft.
- Structural Index
- 3
- Structural Quick
- 3300
- Structural Rating
- 9
- O&M Index
- 2
- O&M Quick
- 2211
- O&M Rating
- 5
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 14
Pipe schematic from manhole 05 0857 to 05 2458 Observation photos (5)

1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

39.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

137.6 ft. - Crack Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES

140.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start