Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2019, 09:34 AM
  • 05 2452_05 0848 _06172019_032408.mp4

Date
06/17/2019
W/O
766396
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00457
PipeID
P06079
Time
2:34 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5598
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_766396_TV05196_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 2452
Downstream MH
05 0848
Dir. of Survey
Downstream
Length Surveyed
325.8 ft.
Total Length
325.8 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
15
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 05 2452 to 05 0848
MH: 05 2452MH: 05 0848downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 24520 ft. MWL - Water Level, 15 %of cross sectional area0.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start0.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start6.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES7.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"10.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"21.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.1 ft. VC - Vermin Cockroach48.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"53.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"89.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"91.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"129.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"132.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"167.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"170.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"177.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE190.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE223.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"279.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - DEBRIS INSIDE299.3 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES321.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish324.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish324.1 ft. SSS - Surface Spalling, from 07 to 08 o'clock, within 8 inches of joint: YES325.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE325.8 ft. B - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES - AT MH CHANNEL325.8 ft. AMH - Downstream Manhole, Survey Ends - 05 0848

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    0.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    0.6 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    6.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES

    299.3 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 07 to 08 o'clock, within 8 inches of joint: YES

    324.1 ft. - Surface Spalling, from 07 to 08 o'clock, within 8 inches of joint: YES

  • Broken, from 05 to 07 o'clock, within 8 inches of joint: YES - AT MH CHANNEL

    325.8 ft. - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES - AT MH CHANNEL

Observations (30)

DistanceCodeObservation
190.7TFDEBRIS INSIDE
324.1DAE
0MWM
48.7TF
170.5TF
299.3SSS
91.8TF
0AMH05 2452
129.9TF
0.5DAGS
223.7TF
325.8MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
21.9CM
10.2TF
35.1VC
0.6DAE
6.9CM
321.9CM
0MWL
325.8BAT MH CHANNEL
325.8AMH05 0848
324.1DAGS
7.6TF
132.4TF
177.9TFDEBRIS INSIDE
324.1SSS
167.9TF
53.8TF
279.5TFDEBRIS INSIDE
89.3TFA

Properties (6)

additional_info
SC377532
custom_field_two
3
customer
LACSD
datetime
2019-06-17T02:34:12-07:00
documentation
ProPipe
is_lateral_inspection
false