Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2019, 11:04 AM
  • 05 0847_05 0846 _06132019_042608.mp4

Date
06/13/2019
W/O
766396
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00457
PipeID
P06077
Time
4:04 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6600
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_766396_TV05196_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
05 0846
Downstream MH
05 0847
Dir. of Survey
Upstream
Length Surveyed
307.7 ft.
Total Length
307.7 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 05 0846 to 05 0847
MH: 05 0846MH: 05 0847upstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 05 08472.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish41.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4"54.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"66.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"92 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"116.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"128.9 ft. CS - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES134.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"142.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"150.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"167.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"171.8 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES195.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"198.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"217.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"242.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"247.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"252.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"291.7 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES305.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start305.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start307.7 ft. VC - Vermin Cockroach307.7 ft. MWL - Water Level, 25 %of cross sectional area307.7 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH ACTIVE307.7 ft. AMH - Downstream Manhole, Survey Begins - 05 0846307.7 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH ABANDONED307.7 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    135.9 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    178.8 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

Observations (30)

DistanceCodeObservation
240.9TF
165.4TF
178.8CS
307.7MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH ACTIVE
0VC
265.9TB
0MWL
172.8TF
157.6TF
307.7AMH05 0847
305.5DAGS
140.4TF
16CM
135.9CS
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH ACTIVE
0AMH05 0846
253.4TF
55.5TF
112TF
2.2DAGS
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH ABANDONED
90.5TF
60.1TF
109.6TF
2.2DAE
215.7TF
0MWM
191.1TF
65.1TF
305.4DAE

Properties (6)

additional_info
SC377530
custom_field_two
3
customer
LACSD
datetime
2019-06-13T04:04:46-07:00
documentation
ProPipe
is_lateral_inspection
false