Wastewater/Activity/PacpInspection/1.0Nov 14, 2019, 07:11 PM
  • 16 0370_16 0369 _11142019_112549.mp4

Date
11/14/2019
W/O
742114
Weather
Dry
Operator/Surveyor
M.MATINEZ
Sewer ID
Z00665
PipeID
P13421
Time
11:11 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6821
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
SAN MARINO
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_742114_TV16032_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0370
Downstream MH
16 0369
Dir. of Survey
Downstream
Length Surveyed
269.9 ft.
Total Length
269.9 ft.
Structural Index
4
Structural Quick
4231
Structural Rating
11
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 16 0370 to 16 0369
MH: 16 0370MH: 16 0369downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03702.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.5 ft. FS - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES12.6 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES19.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start71.9 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"117.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"145.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6"186.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"228.1 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"266.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish266.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish269.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0369

Observation photos (5)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

    6.5 ft. - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    12.6 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    71.9 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
0MWM
228.1TB
71.9TB
145.4TB
19.9FM
266.7DAGS
0MWL
12.6FM
6.5FS
269.9AMH16 0369
0AMH16 0370
117.3TFC
186.7TB
2.7DAGS
266.7FM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-11-14T11:11:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false