Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2019, 12:18 PM
  • 16 0305_16 0304 _11122019_044114.mp4

Date
11/12/2019
W/O
742114
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00665
PipeID
P13356
Time
4:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7118
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
21
Purpose
Routine Assessment
Project
WO_742114_TV16032_OCT2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
20 in.
Width
20 in.
Upstream MH
16 0305
Downstream MH
16 0304
Dir. of Survey
Downstream
Length Surveyed
294.2 ft.
Total Length
294.2 ft.
Structural Index
3
Structural Quick
3F21
Structural Rating
107
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
223
Pipe schematic from manhole 16 0305 to 16 0304
MH: 16 0305MH: 16 0304downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 03050 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start27.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"100 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES102.4 ft. CS - Crack Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES122.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"155.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"221.9 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"228.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"261.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"276.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"292.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish294.2 ft. AMH - Downstream Manhole, Survey Ends - 16 0304

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    100 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES

    102.4 ft. - Crack Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    122.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
86.2TFA
100CM
228.9TFA
122.6CM
155.2TFA
292.8CM
177.6TFA
294.2AMH16 0304
221.9TBA
292.8DAGS
124.1TFC
0MWM
0AMH16 0305
231.2TFC
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
261.5TFC
276.9TFC
27.3TFC
70.5TFC
2DAGS
129.3TFA
102.4CS

Properties (6)

additional_info
SC378749
custom_field_two
3
customer
LACSD
datetime
2019-11-12T04:18:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false