01 0744_01 0743_11202019_090901.mp4
01 0744_01 0743_11202019_090949.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:06 AM
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG
66.9 ft. - General Photograph
79.1 ft. - General Photograph
79.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
304.1 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 66.9 | MGP | — |
| 376.1 | MGO | ROACHES @ MH |
| 79.1 | MGP | — |
| 2 | MGO | Conn. @ Mh, 3 O' Clock. UNKNOWN |
| 2 | SAP | — |
| 376.1 | AMH | 9:32 AM |
| 376.1 | MGO | Grease Throughout The Reach (5%) |
| 79.1 | SRV | — |
| 2 | MGO | ROACHES @ MH |
| 0 | AMH | 9:06 AM |
| 2 | SSS | — |
| 2 | MGO | Conn. @ Mh, 9 O' Clock. UNKNOWN |
| 376.1 | MGO | Peeling & Flaking Throughout The Reach |
| 0 | MWM | — |
| 373 | SZ | 75% MAG |
| 2 | SZ | 75% MAG |
| 304.1 | MGP | — |
| 373 | SAP | — |
| 373 | SSS | — |
| 0 | MWL | — |
| 150.2 | SRV | — |