Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2019, 03:55 PM
  • 01 0745_01 0744_11202019_082403.mp4

Date
11/20/2019
W/O
0802827
Weather
Damp
Operator/Surveyor
FRANKLIN
Sewer ID
Z00205
PipeID
P01654
Time
7:55 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8137
Sewer Name
01 COMPTON DISPOSAL TRUNK
City
COMPTON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Maintenance Related
Project
20191120DF_COMPTON_DISPOSAL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
01 0745
Downstream MH
01 0744
Dir. of Survey
Downstream
Length Surveyed
373.8 ft.
Total Length
373.8 ft.
Structural Index
2
Structural Quick
3121
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 01 0745 to 01 0744
MH: 01 0745MH: 01 0744downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - AIRLINE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 7:58 AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRI - Surface Roughness Increased, from 04 to 08 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG86.3 ft. MGP - General Photograph169.2 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"370.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 60% MAG370.1 ft. SRI - Surface Roughness Increased, from 04 to 08 o'clock, within 8 inches of joint: YES, Finish373.8 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. UNKNOWN373.8 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach373.8 ft. MGO - General Observation - Grease Throughout The Reach (5%)373.8 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. UNKNOWN373.8 ft. AMH - Downstream Manhole, Survey Ends - 8:51 AM

Observation photos (7)

  • General Observation - AIRLINE

    0 ft. - General Observation - AIRLINE

  • Upstream Manhole, Survey Begins - 7:58 AM

    0 ft. - Upstream Manhole, Survey Begins - 7:58 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

  • General Photograph

    86.3 ft. - General Photograph

  • Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"

    169.2 ft. - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"

Observations (19)

DistanceCodeObservation
86.3MGP
373.8MGOConn. @ Mh, 3 O' Clock. UNKNOWN
373.8MGOPeeling & Flaking Throughout The Reach
2SSS
2SRI
370.1SAP
0MWL
373.8MGOGrease Throughout The Reach (5%)
370.1SSS
0MGOAIRLINE
169.2TBA
370.1SZ60% MAG
0MWM
2SAP
373.8MGOConn. @ Mh, 9 O' Clock. UNKNOWN
0AMH7:58 AM
2SZ60% MAG
373.8AMH8:51 AM
370.1SRI

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
LACSD
datetime
2019-11-20T07:55:05-08:00
documentation
FRANKLIN, BRAR, RUVALCABA, IGNACIO
is_lateral_inspection
false