Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 25, 2019, 07:38 PM
  • 02 1886_02 1885_11252019_114504.mp4

  • 02 1886_02 1885_11252019_115012.mp4

Date
11/25/2019
W/O
0802985
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01172
PipeID
P04250
Time
11:38 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8141
Sewer Name
02 DOUGLAS AVENUE RELOCATION TRUNK
City
EAST LA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20191125DF_DOUGLAS_AVENUE_RELOCATION_TRUNK
Material
NRCP
Shape
Circular
Height
8 in.
Upstream MH
02 1886
Downstream MH
02 1885
Dir. of Survey
Downstream
Length Surveyed
309.2 ft.
Total Length
309.2 ft.
Structural Index
3
Structural Quick
4232
Structural Rating
16
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 02 1886 to 02 1885
MH: 02 1886MH: 02 1885downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:43 AM0.1 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 35% MAG2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - ROACHES @ MH74 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4", 4" - Open77.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open108.9 ft. FM - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES, Start119.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"122 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open137.1 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"173.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"185.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open208 ft. FM - Fracture Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES215.2 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open217.1 ft. MGP - General Photograph269.2 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open275.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open306.6 ft. FM - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES, Finish306.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 35% MAG306.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.2 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)309.2 ft. AMH - Downstream Manhole, Survey Ends - 12:15 PM

Observation photos (7)

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • Upstream Manhole, Survey Begins - 11:43 AM

    0 ft. - Upstream Manhole, Survey Begins - 11:43 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES, Start

    108.9 ft. - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES

    208 ft. - Fracture Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES

  • General Photograph

    217.1 ft. - General Photograph

Observations (29)

DistanceCodeObservation
269.2TFOpen
306.6FM
2SAV
2SSS
2MGOConn. @ Mh, 3 O' Clock. Active
309.2MGOGREASE THROUGHOUT THE REACH (5%)
0MWL
306.6SAV
137.1TFA
306.6SZ35% MAG
2SZ35% MAG
215.2TFOpen
217.1MGP
173.2TFA
2CM
77.1TFOpen
208FM
0AMH11:43 AM
309.2AMH12:15 PM
275.6TFOpen
185.2TFOpen
108.9FM
119.1TFA
306.6SSS
2MGOROACHES @ MH
122TFOpen
306.6CM
0.1MWM
74TFOpen

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-11-25T11:38:26-08:00
documentation
FRANKLIN, BRAR
is_lateral_inspection
false