Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 22, 2019, 07:29 PM
  • 22 0754_22 0753_11222019_114919.mp4

Date
11/22/2019
W/O
0798221
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00821
PipeID
P17111
Time
11:29 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8140
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Capital Improvement Program Assesment
Project
20191122DF_PUDDINGSTONE_TRUNK_SECTS_1_2
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0754
Downstream MH
22 0753
Dir. of Survey
Downstream
Length Surveyed
270.2 ft.
Total Length
270.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0754 to 22 0753
MH: 22 0754MH: 22 0753downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:48 AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG17.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"70.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open118.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"170.5 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"218.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"262.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"268.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish268.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish268.2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 60% MAG270.2 ft. AMH - Downstream Manhole, Survey Ends - 12:05 PM270.2 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

Observations (17)

DistanceCodeObservation
270.2AMH12:05 PM
0AMH11:48 AM
17.9TFC
268.2SSS
70.1TFOpen
0MWM
218.5TFC
270.2MGOGREASE THROUGHOUT THE REACH (5%)
268.2SAV
2SAV
1.9SSS
262.7TFC
2SZ70% MAG
268.2SZ60% MAG
170.5TFA
118.5TFC
0MWL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-11-22T11:29:55-08:00
documentation
FRANKLIN, BRAR, RUVALCABA
is_lateral_inspection
false