Wastewater/Activity/PacpInspection/1.0Nov 25, 2019, 10:27 AM
  • Section#2_18 0203_18 0202__11252019__I0269.mp4

Date
11/25/2019
W/O
0801678
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00695
PipeID
P14028
Time
2:27 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
I0269
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Maintenance Related
Project
20191125MDM_ORR_AND_DAY_ROAD_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0203
Downstream MH
18 0202
Dir. of Survey
Downstream
Length Surveyed
372.6 ft.
Total Length
372.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412B
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
36
Pipe schematic from manhole 18 0203 to 18 0202
MH: 18 0203MH: 18 0202downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 STUB0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 2:30AM0 ft. MWL - Water Level, 20 %of cross sectional area87.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - DEBRIE UNDER FLOW105.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Finish - DEBRIE UNDER FLOW124 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - DEBRIE UNDER FLOW149.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - DEBRIE UNDER FLOW198.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish - DEBRIE UNDER FLOW262.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - DEBRIE UNDER FLOW372.6 ft. AMH - Downstream Manhole, Survey Ends - 2:50AM

Observation photos (1)

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO - DEBRIE UNDER FLOW

    124 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - DEBRIE UNDER FLOW

Observations (12)

DistanceCodeObservation
0MWM
105.5DSZDEBRIE UNDER FLOW
198.4DSZDEBRIE UNDER FLOW
262.6DSZDEBRIE UNDER FLOW
0MGOMH CONN 3:00 STUB
0MGOMH CONN 9:00 ACTIVE
124DSZDEBRIE UNDER FLOW
0AMH2:30AM
87.9DSZDEBRIE UNDER FLOW
149.9DSZDEBRIE UNDER FLOW
0MWL
372.6AMH2:50AM

Properties (5)

additional_info
DEBRIE BOTTOM OF PIPE INSPECTION
customer
LACSD
datetime
2019-11-25T02:27:10-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false