Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 10, 2019, 10:14 AM
  • 22 0681_22 0680_06102019_033428.mp4

Date
06/10/2019
W/O
766521
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00827
PipeID
P17031
Time
3:14 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6562
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0681
Downstream MH
22 0680
Dir. of Survey
Downstream
Length Surveyed
372.7 ft.
Total Length
372.7 ft.
Structural Index
2
Structural Quick
322N
Structural Rating
152
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
152
Pipe schematic from manhole 22 0681 to 22 0680
MH: 22 0681MH: 22 0680downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06810 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area4.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.9 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start69.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"210.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"300.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"361 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"371.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"372 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish372 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish372.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0680

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
4.4SAP
210.8TFC
361TFC
0MGOCONNECTION AT THE MH 3 O'CLOCK
225.3TFC
69.5TFC
0AMH22 0681
0MWM
300.6TFC
372SAP
371.2TFC
372.7AMH22 0680
4.9SSS
150.3TFA
372SSS
94.7TFC
0MWL

Properties (6)

additional_info
SC377685
custom_field_two
2
customer
LACSD
datetime
2019-06-10T03:14:46-07:00
documentation
PROPIPE
is_lateral_inspection
false