Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2019, 06:55 AM
  • 22 0665_22 0664_06182019_002020.mp4

Date
06/17/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17014
Time
11:55 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6608
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0664
Downstream MH
22 0665
Dir. of Survey
Upstream
Length Surveyed
300 ft.
Total Length
300 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0664 to 22 0665
MH: 22 0664MH: 22 0665upstream0 ft. MGO - General Observation - COCKROACHES IN MH.0 ft. AMH - Upstream Manhole, Survey Ends - 22 06651.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish23.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"28.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"194.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"239.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"298 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start298 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start300 ft. MWM - Water Mark, 20 %of cross sectional area300 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK300 ft. AMH - Downstream Manhole, Survey Begins - 22 0664300 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH.

    300 ft. - General Observation - COCKROACHES IN MH.

Observations (19)

DistanceCodeObservation
211TFA
298.2DAGS
276.6TFC
2DAGS
60.8TFA
300MGOCOCKROACHES IN MH.
105.5TFC
0MWM
2SSS
2SAP
271.4TFC
0MGOCONNECTION AT MH 9 O'CLOCK
298.2SAP
300AMH22 0665
298.2SSS
110.9TFC
0AMH22 0664
0MWL
206.1TFC

Properties (6)

additional_info
SC378174
custom_field_two
2
customer
LACSD
datetime
2019-06-17T23:55:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false