Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2019, 07:32 AM
  • 22 0631_22 0630 _05292019_005054.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16979
Time
12:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6546
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0631
Downstream MH
22 0630
Dir. of Survey
Downstream
Length Surveyed
325.7 ft.
Total Length
325.7 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
312L
O&M Rating
131
Overall Index
2
Overall Quick
Overall Rating
451
Pipe schematic from manhole 22 0631 to 22 0630
MH: 22 0631MH: 22 0630downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06310 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.6 ft. DAZ - Deposits Attached Other, 15 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: YES - MINERALS154.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"199 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"220 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"280.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"305.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish324.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0630325.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Other, 15 %of cross sectional area, from 07 to 10 o'clock,  , within 8 inches of joint: YES - MINERALS

    150.6 ft. - Deposits Attached Other, 15 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: YES - MINERALS

  • General Observation - COCKROACHES IN MANHOLE

    325.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (26)

DistanceCodeObservation
2DAGS
325.7AMH22 0630
325.7MGOCOCKROACHES IN MANHOLE
150.6DAZMINERALS
305.2TFC
0MWM
324.1DAGS
231.2TFC
280.7TFA
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH22 0631
49TFA
89.7TFC
4.4TFC
324.1SAP
85.3TFC
220TFA
2SAP
324.1SSS
0MWL
150.4TFA
154.4TFA
199TFC
2SSS
54.1TFC
0MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC378161
custom_field_two
2
customer
LACSD
datetime
2019-05-29T00:32:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false