Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2019, 04:51 AM
  • 22 0655_22 0654 _05232019_221150.mp4

Date
05/23/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17003
Time
9:51 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6541
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0655
Downstream MH
22 0654
Dir. of Survey
Downstream
Length Surveyed
65 ft.
Total Length
65 ft.
Structural Index
3
Structural Quick
3A25
Structural Rating
46
O&M Index
2
O&M Quick
2A00
O&M Rating
24
Overall Index
2
Overall Quick
Overall Rating
70
Pipe schematic from manhole 22 0655 to 22 0654
MH: 22 0655MH: 22 0654downstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 22 06550 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.2 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"62.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish62.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish62.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish65 ft. AMH - Downstream Manhole, Survey Ends - 22 065465 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK65 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    65 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
62.2SSS
62.2DAGS
0DAGS
0MGOCOCKROACHES IN MANHOLE
65AMH22 0654
0AMH22 0655
0MWL
62.2SAP
65MGOACTIVE CONNECTION AT MH 9 O'CLOCK
65MGOCOCKROACHES IN MANHOLE
43.2TBA
37.5SSS
2SAP
0MWM

Properties (6)

additional_info
SC378156
custom_field_two
2
customer
LACSD
datetime
2019-05-23T21:51:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false