Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2019, 05:02 AM
  • 22 0638_22 0637 _05282019_221208.mp4

Date
05/28/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16986
Time
10:02 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6546
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0638
Downstream MH
22 0637
Dir. of Survey
Downstream
Length Surveyed
209.3 ft.
Total Length
209.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole 22 0638 to 22 0637
MH: 22 0638MH: 22 0637downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06382 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"74.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"196.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"208 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish208 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish209.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0637209.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    209.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
2DAGS
196.9TFA
208SSS
172.6TFC
98.6TFA
0MWL
208DAGS
2SAP
209.3AMH22 0637
0MWM
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH22 0638
147.7TFC
2SSS
21.8TFC
208SAP
119.1TFC
209.3MGOCOCKROACHES IN MANHOLE
74.6TFC
49.9TFA

Properties (6)

additional_info
SC378161
custom_field_two
2
customer
LACSD
datetime
2019-05-28T22:02:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false