Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2019, 05:12 AM
  • 22 0637_22 0636 _05282019_221816.mp4

Date
05/28/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16985
Time
10:12 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6546
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0637
Downstream MH
22 0636
Dir. of Survey
Downstream
Length Surveyed
53.6 ft.
Total Length
53.6 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
50
O&M Index
2
O&M Quick
2900
O&M Rating
18
Overall Index
2
Overall Quick
Overall Rating
68
Pipe schematic from manhole 22 0637 to 22 0636
MH: 22 0637MH: 22 0636downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06370 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start12.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"40.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish51.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish51.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK53.6 ft. AMH - Downstream Manhole, Survey Ends - 22 063653.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    5.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

    53.6 ft. - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

  • General Observation - COCKROACHES IN MANHOLE

    53.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
51.1SSS
53.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK
40.2TFA
0MWM
2SSS
0AMH22 0637
12.1TFC
53.6AMH22 0636
5.9DAGS
51.1DAGS
2SAP
53.6MGOCOCKROACHES IN MANHOLE
0MWL
0MGOCOCKROACHES IN MANHOLE
51.1SAP

Properties (6)

additional_info
SC378161
custom_field_two
2
customer
LACSD
datetime
2019-05-28T22:12:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false