Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2019, 09:25 AM
  • 22 0627_22 0626 _05292019_023120.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16975
Time
2:25 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6546
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0627
Downstream MH
22 0626
Dir. of Survey
Downstream
Length Surveyed
64.3 ft.
Total Length
64.3 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
60
O&M Index
2
O&M Quick
2A00
O&M Rating
24
Overall Index
2
Overall Quick
Overall Rating
84
Pipe schematic from manhole 22 0627 to 22 0626
MH: 22 0627MH: 22 0626downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06270 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"62.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish62.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish62.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish64.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK64.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE64.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0626

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    64.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
2SSS
2DAGS
0MWL
64.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
62.4SAP
31.8TFC
64.3MGOCOCKROACHES IN MANHOLE
62.4SSS
0AMH22 0627
62.4DAGS
11.6TFC
0MWM
64.3AMH22 0626
0MGOCOCKROACHES IN MANHOLE
2SAP

Properties (6)

additional_info
SC378161
custom_field_two
2
customer
LACSD
datetime
2019-05-29T02:25:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false