Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2019, 05:00 AM
  • 22 0624_22 0623 _05292019_220735.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16972
Time
10:00 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6547
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0624
Downstream MH
22 0623
Dir. of Survey
Downstream
Length Surveyed
105.2 ft.
Total Length
105.2 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
100
O&M Index
2
O&M Quick
2C00
O&M Rating
40
Overall Index
2
Overall Quick
Overall Rating
140
Pipe schematic from manhole 22 0624 to 22 0623
MH: 22 0624MH: 22 0623downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 22 06240 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start55.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"103.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish103.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish103.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish105.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK105.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0623

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
55.4TFA
0AMH22 0624
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
103.3SSS
2SSS
0MWL
103.3DAGS
0MWM
2DAGS
105.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
103.3SAP
105.2AMH22 0623

Properties (6)

additional_info
SC378162
custom_field_two
2
customer
LACSD
datetime
2019-05-29T22:00:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false