Wastewater/Activity/PacpInspection/1.0May 30, 2019, 08:19 AM
  • 22 0615A_22 0615 _05302019_012833.mp4

Date
05/30/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16963
Time
1:19 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6547
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0615A
Downstream MH
22 0615
Dir. of Survey
Downstream
Length Surveyed
160.2 ft.
Total Length
160.2 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
155
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
217
Pipe schematic from manhole 22 0615A to 22 0615
MH: 22 0615AMH: 22 0615downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0615A2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start45.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"66 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"135 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish157.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish157.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish160.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0615

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2SSS
2SAP
135TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
0MGOCOCKROACHES IN MANHOLE
157.6SSS
0MWM
2DAGS
160.2AMH22 0615
45.8TFA
122.7TF
66TF
0AMH22 0615A
157.6DAGS
91.1TFA
157.6SAP

Properties (6)

additional_info
SC378162
custom_field_two
2
customer
LACSD
datetime
2019-05-30T01:19:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false