Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2019, 09:05 AM
  • 22 0611_22 0610 _05312019_022436.mp4

Date
05/31/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16958
Time
2:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6548
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0610
Downstream MH
22 0611
Dir. of Survey
Upstream
Length Surveyed
452.2 ft.
Total Length
452.2 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
445
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
2
Overall Quick
Overall Rating
623
Pipe schematic from manhole 22 0610 to 22 0611
MH: 22 0610MH: 22 0611upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06112.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish2.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish39.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"43.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"84.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"87.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"192.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"262.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"314.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"338.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"354.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"361.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"390.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"414.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"447.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start447.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start447.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start452.2 ft. MWL - Water Level, 15 %of cross sectional area452.2 ft. AMH - Downstream Manhole, Survey Begins - 22 0610452.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK452.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE452.2 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    4.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (30)

DistanceCodeObservation
231.1TFC
0MWL
113.6TFC
259.6TFC
364.5TFC
190TFA
4.6SAP
311.8TFA
449.8DAGS
336TFC
412.3TFC
4.6DAGS
0AMH22 0610
449.8SAP
137.7TFC
182TFA
97.5TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
449.8SSS
368.1TFC
408.3TFC
90.9TFC
61.4TFA
37.7TFC
4.6SSS
0MGOCOCKROACHES IN MANHOLE
0MWM
283.4TFC
210.4TFC
452.2AMH22 0611

Properties (6)

additional_info
SC378163
custom_field_two
2
customer
LACSD
datetime
2019-05-31T02:05:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false