Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2019, 07:17 AM
  • 22 0649_22 0648 _05242019_002817.mp4

Date
05/24/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16997
Time
12:17 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6541
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0649
Downstream MH
22 0648
Dir. of Survey
Downstream
Length Surveyed
211.3 ft.
Total Length
211.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
294
Pipe schematic from manhole 22 0649 to 22 0648
MH: 22 0649MH: 22 0648downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06490 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start53.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish211.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0648211.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    211.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
211.3AMH22 0648
0MGOCOCKROACHES IN MANHOLE
53.8TFC
210.6SAP
2SSS
2DAGS
57.9TFC
0MWM
0AMH22 0649
2SAP
199.1TFC
210.6SSS
203.1TFC
126.2TFC
210.6DAGS
211.3MGOCOCKROACHES IN MANHOLE
0MWL

Properties (6)

additional_info
SC378156
custom_field_two
2
customer
LACSD
datetime
2019-05-24T00:17:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false