Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2019, 07:28 AM
  • 22 0648_22 0647 _05242019_003615.mp4

Date
05/24/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16996
Time
12:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6541
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0648
Downstream MH
22 0647
Dir. of Survey
Downstream
Length Surveyed
117.3 ft.
Total Length
117.3 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
115
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
2
Overall Quick
Overall Rating
161
Pipe schematic from manhole 22 0648 to 22 0647
MH: 22 0648MH: 22 0647downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06482 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start41.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"45.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish116.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish117.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE117.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0647

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    117.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
0MWM
41.4TFC
45.4TFC
0MWL
0AMH22 0648
116.5DAGS
116.5SAP
117.3MGOCOCKROACHES IN MANHOLE
116.5SSS
2SSS
94TFC
2SAP
2DAGS
89.7TFC
117.3AMH22 0647