Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2019, 05:29 AM
  • 22 0622_22 0621 _05292019_223808.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16970
Time
10:29 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6547
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0622
Downstream MH
22 0621
Dir. of Survey
Downstream
Length Surveyed
132.2 ft.
Total Length
132.2 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
130
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
182
Pipe schematic from manhole 22 0622 to 22 0621
MH: 22 0622MH: 22 0621downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06222 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"10.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"59.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"75 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"130.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish130.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish130.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish132.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE132.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0621

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    132.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
132.2MGOCOCKROACHES IN MANHOLE
130.4SAP
130.4SSS
132.2AMH22 0621
6.9TFC
103.3TFC
119.7TFC
10.7TFC
0MWM
59.6TFC
2SAP
0MWL
2DAGS
2SSS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
75TFC
130.4DAGS
0AMH22 0622

Properties (6)

additional_info
SC378162
custom_field_two
2
customer
LACSD
datetime
2019-05-29T22:29:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false