Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2019, 06:11 AM
  • 22 0619_22 0618 _05292019_232503.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16967
Time
11:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6547
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0619
Downstream MH
22 0618
Dir. of Survey
Downstream
Length Surveyed
230.6 ft.
Total Length
230.6 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
230
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
322
Pipe schematic from manhole 22 0619 to 22 0618
MH: 22 0619MH: 22 0618downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06190 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"14.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"132 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"155.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"204.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish229.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish229.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish230.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK230.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0618

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
229.6SSS
0MGOCOCKROACHES IN MANHOLE
230.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2DAGS
229.6SAP
107.6TFC
2SSS
0MWL
0AMH22 0619
132TFC
0MWM
58.6TFC
14.8TFC
119TBA
2SAP
229.6DAGS
11.7TFA
204.8TFC
230.6AMH22 0618
155.9TFC

Properties (6)

additional_info
SC378162
custom_field_two
2
customer
LACSD
datetime
2019-05-29T23:11:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false