Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2019, 06:27 AM
  • 22 0618_22 0617 _05292019_233926.mp4

Date
05/29/2019
W/O
766521
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16966
Time
11:27 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6547
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_766521_TV22166_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0618
Downstream MH
22 0617
Dir. of Survey
Downstream
Length Surveyed
211.6 ft.
Total Length
211.6 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
2H00
O&M Rating
86
Overall Index
2
Overall Quick
Overall Rating
296
Pipe schematic from manhole 22 0618 to 22 0617
MH: 22 0618MH: 22 0617downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06182 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"34.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.9 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 6", 2"134.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0617211.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish211.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish211.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 6", 2"

    89.9 ft. - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 6", 2"

Observations (19)

DistanceCodeObservation
89.9TBI
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
134.5TFC
2DAGS
211.6AMH22 0617
211.6SAP
21.7TFC
34.3TFA
2SSS
211.6SSS
198.7TFA
85.7TFC
0MWM
2SAP
190.9TFC
0MWL
211.6DAGS
183.3TFA
0AMH22 0618

Properties (6)

additional_info
SC378162
custom_field_two
2
customer
LACSD
datetime
2019-05-29T23:27:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false