C 0376C 0375 District 19_050819.mp4
6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
8.1 ft. - Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES
29.1 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES
71.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
94.4 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
198.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
198.8 ft. - Hole Void Visible, from 12 to 03 o'clock, within 8 inches of joint: YES
216.6 ft. - Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES
310.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
338.6 ft. - Infiltration Stain, at 02 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 310.3 | SAP | — |
| 6 | SRV | — |
| 376.2 | AMH | C 0375 |
| 310.3 | SRV | — |
| 216.6 | IR | — |
| 71.2 | SAP | — |
| 94.4 | SRV | — |
| 374.2 | SAP | — |
| 8.1 | IR | — |
| 338.6 | IS | — |
| 198.8 | SRV | — |
| 29.1 | IR | — |
| 0 | MGO | CONNECTION IN MH 3 OCLOCK |
| 198.8 | HVV | — |
| 303.8 | LR | — |
| 0 | AMH | C 0376 |
| 198.8 | SAP | — |
| 0 | MWM | — |
| 71.2 | SRV | — |
| 376.2 | MGO | CONNECTION IN MH AT 3 OCLOCK |
| 191.6 | TFA | — |