Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2019, 07:30 PM
  • H 0375_H 0342_12092019_134610.mp4

Date
09/12/2019
W/O
776982
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00177
PipeID
P10804
Time
12:30 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6959
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_776982_TV15225_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
66 in.
Width
66 in.
Upstream MH
H 0375
Downstream MH
H 0342
Dir. of Survey
Downstream
Length Surveyed
931.5 ft.
Total Length
931.5 ft.
Structural Index
3
Structural Quick
3d2d
Structural Rating
920
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
921
Pipe schematic from manhole H 0375 to H 0342
MH: H 0375MH: H 0342downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 03750 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 35 %of cross sectional area8.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.6 ft. MGO - General Observation - MAG COAT THROUGHOUT931 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish931 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish931.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"931.5 ft. MSA - Survey Abandoned - CAMERA FLIPPED

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    8.6 ft. - General Observation - MAG COAT THROUGHOUT

Observations (11)

DistanceCodeObservation
8.6SSS
8.6SAP
0MWM
931SAP
0AMHH 0375
931.5TF
931.5MSACAMERA FLIPPED
931SSS
0VC
0MWL
8.6MGOMAG COAT THROUGHOUT

Properties (7)

additional_info
SC378568
custom_field_two
3
customer
LACSD
datetime
2019-09-12T12:30:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
38626