08 0463_08 0477 _11122019_031517.mp4

0 ft. - Upstream Manhole, Survey Begins - 08 0463

7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
7.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
7.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

51 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
51.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
191.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - BROKEN
452.5 ft. - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - BROKEN
522.5 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BROKEN
| Distance | Code | Observation |
|---|---|---|
| 781.7 | MGO | CABLE CAUGHT ON DEBRIS |
| 0 | MWL | — |
| 452.5 | SRC | BROKEN |
| 794.1 | SAP | — |
| 7 | DAGS | — |
| 7.2 | MGO | MAG COAT THROUGHOUT |
| 7.2 | SAP | — |
| 793.8 | SRC | — |
| 51.2 | SSS | — |
| 794 | SSS | — |
| 51 | SSS | — |
| 794.1 | AMH | 08 0477 |
| 782.5 | MGO | MH VISIBLE AHEAD |
| 793.9 | SSS | — |
| 191.5 | SRC | BROKEN |
| 0 | AMH | 08 0463 |
| 0 | MWM | — |
| 522.5 | SRC | BROKEN |
| 794 | DAGS | — |
| 524.7 | SRV | — |
| 7.2 | SRV | — |