Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2019, 06:36 AM
  • B 1395_B 1394 _09162019_234920.mp4

Date
09/16/2019
W/O
787657
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01126
PipeID
P25107
Time
11:36 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6933
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
04
Purpose
Routine Assessment
Project
WO_787657_TV30028_SEP2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
20 in.
Width
20 in.
Upstream MH
B 1395
Downstream MH
B 1394
Dir. of Survey
Downstream
Length Surveyed
118 ft.
Total Length
118 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
30
O&M Index
2
O&M Quick
2D11
O&M Rating
51
Overall Index
2
Overall Quick
Overall Rating
81
Pipe schematic from manhole B 1395 to B 1394
MH: B 1395MH: B 1394downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - B 13950 ft. MWM - Water Mark, 25 %of cross sectional area3.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.5 ft. RFL - Roots Fine Lateral, from 02 to 05 o'clock23.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"59.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish74.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"99.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start114.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"115.8 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish115.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish117.9 ft. MGO - General Observation - CONNECTION AT 3 O'CLOCK118 ft. AMH - Downstream Manhole, Survey Ends - B 1394

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Lateral, from 02 to 05 o'clock

    22.5 ft. - Roots Fine Lateral, from 02 to 05 o'clock

Observations (16)

DistanceCodeObservation
0MWL
99.5DSC
117.9MGOCONNECTION AT 3 O'CLOCK
115.8DSC
59.5CM
74.1TFC
114.6TFC
118AMHB 1394
23.5TF
0MGOCONNECTION AT 9 O'CLOCK
3.5DAGS
22.5RFL
115.9DAGS
11.3CM
0AMHB 1395
0MWM

Properties (6)

additional_info
SC378532
custom_field_two
4
customer
LACSD
datetime
2019-09-16T23:36:27-07:00
documentation
PROPIPE
is_lateral_inspection
false