Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2019, 05:04 AM
  • B 1393_B 1392 _09162019_222249.mp4

Date
09/16/2019
W/O
787657
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01126
PipeID
P25105
Time
10:04 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6933
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
04
Purpose
Routine Assessment
Project
WO_787657_TV30028_SEP2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
20 in.
Width
20 in.
Upstream MH
B 1393
Downstream MH
B 1392
Dir. of Survey
Downstream
Length Surveyed
227.8 ft.
Total Length
227.8 ft.
Structural Index
2
Structural Quick
2500
Structural Rating
10
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
102
Pipe schematic from manhole B 1393 to B 1392
MH: B 1393MH: B 1392downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 13930.2 ft. MWM - Water Mark, 25 %of cross sectional area6.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start34.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"35.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"37.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"81.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"84.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"132.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"135 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"141.6 ft. SSS - Surface Spalling, from 09 to 01 o'clock, within 8 inches of joint: YES, Start164.9 ft. SSS - Surface Spalling, from 09 to 01 o'clock, within 8 inches of joint: YES, Finish187.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"190.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"216.9 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start226.1 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish226.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish227.8 ft. AMH - Downstream Manhole, Survey Ends - B 1392

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 01 o'clock, within 8 inches of joint: YES, Start

    141.6 ft. - Surface Spalling, from 09 to 01 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWL
36.2TFC
226.2DAGS
190.6TF
81.9TFC
135TFC
34.5TFC
227.8AMHB 1392
226.1DSC
0AMHB 1393
6.4DAGS
216.9DSC
187.9TF
35.7TB
132.3TF
141.6SSS
37.8TB
84.7TF
0.2MWM
164.9SSS

Properties (6)

additional_info
SC378532
custom_field_two
3
customer
LACSD
datetime
2019-09-16T22:04:10-07:00
documentation
PROPIPE
is_lateral_inspection
false