Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 11, 2019, 08:36 AM
  • B 1384_B 1383 _09112019_015105.mp4

Date
09/11/2019
W/O
787657
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01126
PipeID
P25096
Time
1:36 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6928
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
08
Purpose
Routine Assessment
Project
WO_787657_TV30028_SEP2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
B 1384
Downstream MH
B 1383
Dir. of Survey
Downstream
Length Surveyed
294.7 ft.
Total Length
294.7 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
3
Overall Quick
Overall Rating
290
Pipe schematic from manhole B 1384 to B 1383
MH: B 1384MH: B 1383downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 13840 ft. MGO - General Observation - CONNECTION AT 9 O'CLOCK0.1 ft. MWM - Water Mark, 40 %of cross sectional area4.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.8 ft. MGO - General Observation - LIGHT STEAM IN SEWER15.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"114.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"117.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"163.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"164 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"215.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"218.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"220.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"273.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"293 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish294.7 ft. AMH - Downstream Manhole, Survey Ends - B 1383

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
293CM
114.7TFC
218.5TFC
6.8MGOLIGHT STEAM IN SEWER
4.9CM
164TB
15.8TF
4.9DAGS
0MWL
215.8TFC
293DAGS
0AMHB 1384
0.1MWM
271.6TF
294.7AMHB 1383
220.5TB
0MGOCONNECTION AT 9 O'CLOCK
117.7TFC
163.5TFC
165.8TF
273.9TF

Properties (6)

additional_info
SC378526
custom_field_two
3
customer
LACSD
datetime
2019-09-11T01:36:42-07:00
documentation
PROPIPE
is_lateral_inspection
false