H 0628_H 0866_11182019_041022.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
75.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
302.1 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start - LONG REBAR
302.1 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
314.1 ft. - Surface Reinforcement Visible, from 08 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR
314.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
320 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR
323.3 ft. - Surface Missing Wall, from 08 to 10 o'clock, within 8 inches of joint: NO - SOIL VISIBLE
323.3 ft. - Surface Missing Wall, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE
328.6 ft. - Surface Missing Wall, from 08 to 10 o'clock, within 8 inches of joint: NO - SOIL VISIBLE
328.8 ft. - Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: NO - MISSING REBAR
335.7 ft. - Surface Missing Wall, from 02 to 04 o'clock, within 8 inches of joint: NO - SOIL VISIBLE
340.2 ft. - Surface Missing Wall, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - SOIL VISIBLE
| Distance | Code | Observation |
|---|---|---|
| 305.7 | SRV | LONG REBAR |
| 8 | SAV | SEVERE AGG SPORATIC |
| 75.1 | SSS | PEELING CONCRETE |
| 0 | MWM | — |
| 340.2 | SRC | LONG & CIRCUM REBAR |
| 340.2 | SAM | SEVERE AGG |
| 340.2 | SMW | SOIL VISIBLE |
| 340.2 | AMH | 5:20AM |
| 320 | TF | Active |
| 328.8 | SRC | MISSING REBAR |
| 0 | AMH | 4:25AM |
| 314.1 | SRV | LONG & CIRCUM REBAR |
| 302.1 | SRV | LONG REBAR |
| 323.3 | SMW | SOIL VISIBLE |
| 302.1 | SAV | SEVERE AGG SPORATIC |
| 335.7 | SMW | SOIL VISIBLE |
| 340.2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 314.1 | SAM | SEVERE AGG |
| 259.6 | TF | Active |
| 0 | MWL | — |
| 328.6 | SMW | SOIL VISIBLE |
| 320 | SRC | LONG & CIRCUM REBAR |
| 340.2 | SRV | LONG & CIRCUM REBAR |
| 323.3 | SMW | SOIL VISIBLE |