Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2019, 09:59 AM
  • A 0646_A 0645_11182019_021209.mp4

Date
11/18/2019
W/O
0802893
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00316
PipeID
P26640
Time
1:59 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1312
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Maintenance Related
Project
20191118MDM_JOA_1A_DISTRICT_21_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
A 0646
Downstream MH
A 0645B
Dir. of Survey
Downstream
Length Surveyed
225.5 ft.
Total Length
225.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole A 0646 to A 0645B
MH: A 0646MH: A 0645Bdownstream0 ft. AMH - Downstream Manhole, Survey Begins - 1:55AM0 ft. MGO - General Observation - MH CONN 11:00 ACTIVE IN STACK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open164.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped225.5 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (1)

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped

    164.3 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped

Observations (7)

DistanceCodeObservation
8TFOpen
164.3TFCCapped
0AMH1:55AM
0MGOMH CONN 11:00 ACTIVE IN STACK
225.5AMH2:15AM
0MWL
0MWM

Properties (5)

additional_info
LATERIAL AT 164'
customer
LACSD
datetime
2019-11-18T01:59:34-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false