Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2019, 06:37 PM
  • BLANK_H 0523_11192019_110630.mp4

Date
11/19/2019
W/O
0792641
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00183
PipeID
P10949
Time
10:37 AM
Certificate
U-415-060624039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8135
Sewer Name
H JOINT OUTFALL H - UNIT 7B
City
INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
20191118DF_JOINT_OUTFALL_H_UNIT_7B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
H 0523
Downstream MH
BLANK
Dir. of Survey
Upstream
Length Surveyed
155.6 ft.
Total Length
155.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0523 to BLANK
MH: H 0523MH: BLANKupstream0 ft. MGO - General Observation - Grease Throughout The Reach (5%)0 ft. AMH - Upstream Manhole, Survey Ends - 11:21 AM0.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active1.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 40% MAG1.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish16.8 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach34.8 ft. MGP - General Photograph63 ft. MGP - General Photograph94.3 ft. MGP - General Photograph153.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start153.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start153.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG155.5 ft. MWM - Water Mark, 20 %of cross sectional area155.5 ft. MWL - Water Level, 15 %of cross sectional area155.6 ft. AMH - Downstream Manhole, Survey Begins - 10:38 AM

Observation photos (8)

  • Downstream Manhole, Survey Begins - 10:38 AM

    0 ft. - Downstream Manhole, Survey Begins - 10:38 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG

  • General Photograph

    61.3 ft. - General Photograph

  • General Photograph

    92.6 ft. - General Photograph

  • General Photograph

    120.8 ft. - General Photograph

  • General Observation - Peeling & Flaking Throughout The Reach

    138.8 ft. - General Observation - Peeling & Flaking Throughout The Reach

Observations (16)

DistanceCodeObservation
0.1MWM
155.6MGOGrease Throughout The Reach (5%)
92.6MGP
2SSS
155MGOConn. @ Mh, 9 O' Clock. Active
138.8MGOPeeling & Flaking Throughout The Reach
154SSS
154SZ40% MAG
155.6AMH11:21 AM
154SAV
120.8MGP
0.1MWL
2SAV
2SZ40% MAG
61.3MGP
0AMH10:38 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-11-19T10:37:13-08:00
documentation
FRANKLIN, RUVALCABA, BRAR, IGNACIO
is_lateral_inspection
false