Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2019, 05:25 PM
  • H 0627_H 0626_11192019_093104.mp4

Date
11/19/2019
W/O
0792641
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00183
PipeID
P10950
Time
9:25 AM
Certificate
U-415-060624039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8135
Sewer Name
H JOINT OUTFALL H - UNIT 7B
City
INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
20191118DF_JOINT_OUTFALL_H_UNIT_7B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
H 0627
Downstream MH
H 0626
Dir. of Survey
Downstream
Length Surveyed
452.5 ft.
Total Length
452.5 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
17
Pipe schematic from manhole H 0627 to H 0626
MH: H 0627MH: H 0626downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:26 AM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.1 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"51.1 ft. MGP - General Photograph83.4 ft. MGP - General Photograph83.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start211.9 ft. MGP - General Photograph226.8 ft. MGP - General Photograph341 ft. MGP - General Photograph437.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"452.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish452.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish452.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish452.5 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish452.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (10)

  • Upstream Manhole, Survey Begins - 9:26 AM

    0 ft. - Upstream Manhole, Survey Begins - 9:26 AM

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    51.1 ft. - General Photograph

  • General Photograph

    83.4 ft. - General Photograph

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    83.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    211.9 ft. - General Photograph

  • General Photograph

    226.8 ft. - General Photograph

  • General Photograph

    341 ft. - General Photograph

Observations (20)

DistanceCodeObservation
452.5SRV
83.4MGP
452.5SAP
226.8MGP
0MWM
0MWL
341MGP
452.5SSS
2SAP
51.1MGP
211.9MGP
2SRV
0AMH9:26 AM
452.5SRC
2SRC
83.4DAGS
2SSS
16.1TFA
437.5TFA
452.5DAGS

Properties (6)

custom_field_three
REINFORCEMENT AND AGGREGATE VISIBLE
custom_field_two
2
customer
LACSD
datetime
2019-11-19T09:25:09-08:00
documentation
FRANKLIN, RUVALCABA, BRAR, IGNACIO
is_lateral_inspection
false