Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2019, 01:01 PM
  • 18 0965_18 0978_11192019_050705.mp4

Date
11/19/2019
W/O
0798462
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00716
PipeID
P14815
Time
5:01 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1311
Sewer Name
18 WORSHAM CREEK TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
11
Purpose
Routine Assessment
Project
20191114MDM_WORSHAM_CREEK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
18 0965
Downstream MH
18 0978
Dir. of Survey
Downstream
Length Surveyed
162.8 ft.
Total Length
162.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 18 0965 to 18 0978
MH: 18 0965MH: 18 0978downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:05AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 15 %of cross sectional area56.3 ft. MGO - General Observation - 10" VCP-PVCP132.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open162.2 ft. MGO - General Observation - Conn. @ Mh, 4 O'OPEN162.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN162.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active162.8 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (1)

  • General Observation - 10" VCP-PVCP

    56.3 ft. - General Observation - 10" VCP-PVCP

Observations (10)

DistanceCodeObservation
162.8AMH5:20AM
0MWL
162.2MGOConn. @ Mh, 4 O'OPEN
0AMH5:05AM
132.4TBOpen
162.2MGOConn. @ Mh, 9 O' Clock. OPEN
0MGOConn. @ Mh, 3 O' Clock. Active
162.2MGOConn. @ Mh, 3 O' Clock. Active
0MWM
56.3MGO10" VCP-PVCP

Properties (7)

custom_field_three
LINER GOOD COND
custom_field_two
4
customer
LACSD
datetime
2019-11-19T05:01:48-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
PVCP