Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 25, 2018, 10:36 AM
  • 15 0881_15 0880 _25042018_035642.mp4

Date
04/25/2018
W/O
695662
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00599
PipeID
P12674
Time
3:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5576
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
WO_695662_TV15182_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0881
Downstream MH
15 0880
Dir. of Survey
Downstream
Length Surveyed
368.5 ft.
Total Length
368.5 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
219
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
221
Pipe schematic from manhole 15 0881 to 15 0880
MH: 15 0881MH: 15 0880downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 08812 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"164.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"167.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"200.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"203.8 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"277 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"279.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"335 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"337.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"367 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish368.5 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 AND 9 O'CLOCK368.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0880368.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"

    203.8 ft. - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"

Observations (17)

DistanceCodeObservation
75.8TFC
203.8TBI
368.5MGOCAPPED CONNECTION AT MH 3 AND 9 O'CLOCK
0MWM
0MWL
167.3TFC
279.9TF
335TF
368.5AMH15 0880
200.9TFC
368.5MGOCOCKROACHES IN MANHOLE
367SAP
2SAP
0AMH15 0881
164.4TFC
337.8TF
277TF

Properties (6)

additional_info
SC358536
custom_field_two
2
customer
LACSD
datetime
2018-04-25T03:36:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false