04 0069_04 0068_10072019_041522.mp4

0 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK

0 ft. - Upstream Manhole, Survey Begins - 04 0069
2 ft. - Obstacles Other, 5 %of cross sectional area, from 05 to 07 o'clock, Start - DEBRIS
4 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
26.7 ft. - Tap Factory Made at 02 o'clock, -, within 8 inches of joint: NO, 4" - TAP ROOTS
37.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
147.6 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 4"
225 ft. - Fracture Longitudinal Hinge, 2, from 03 to 09 o'clock, within 8 inches of joint: YES
225 ft. - Infiltration Stain, from 03 to 09 o'clock, within 8 inches of joint: YES
227.7 ft. - Hole Soil Visible, at 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 15.5 | FM | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 147.6 | TFD | — |
| 225 | FH2 | — |
| 288.2 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 0 | MWM | — |
| 284.8 | DAGS | — |
| 31.5 | TF | — |
| 269.4 | TFC | — |
| 37.3 | DAGS | — |
| 0 | AMH | 04 0069 |
| 87.6 | TFC | — |
| 108.2 | TFC | — |
| 0 | MWL | — |
| 231.4 | TBA | — |
| 37.3 | OBZ | DEBRIS |
| 225 | IS | — |
| 229.2 | TFC | — |
| 208.4 | TFC | — |
| 288.2 | AMH | 04 0068 |
| 187.5 | TFC | — |
| 66.7 | TF | — |
| 227.7 | HSV | — |
| 194.9 | TBA | — |
| 4 | FM | — |
| 2 | OBZ | DEBRIS |
| 26.7 | TFC | TAP ROOTS |